عدادات الكهرباء ثلاثية الطور DLMS
عرض 12 من كل النتائج
Three-phase electricity meters are used at industrial plants, commercial buildings and infrastructure sites where consumption must be measured across three-phase loads. For projects that also require standardised data exchange, a dlms meter provides a common protocol layer between field devices and the upper-level metering system. JCOM IoT supplies the AIST A300 series in multiple communication configurations for remote reading, automated data collection and integration with existing infrastructure.
DLMS-Compliant Three-Phase Energy Meters
DLMS/COSEM defines how metering data is structured and exchanged between devices and data collection systems. For utilities and industrial operators, this means dlms compliant energy meters from different deployment phases can be integrated around the same exchange model instead of relying on a proprietary format for every device family.
A dlms energy meter is useful when a project combines many metering points, several communication channels or staged equipment replacement. The protocol remains the same while the transport layer can change according to the site, helping integrators keep the data architecture consistent as the system expands.
DLMS Compliant Energy Meters in Industrial Metering
A standardised data model is especially useful at sites where meters are introduced in several stages or connected through different communication infrastructures. It allows the metering layer to be expanded without changing the basic principles of data exchange each time another group of devices is added.
JCOM IoT as a DLMS Three-Phase Energy Meter Supplier
As a dlms three-phase energy meter supplier, JCOM IoT offers the AIST A300 family for utility, commercial and industrial metering. The series includes twelve configurations for different communication and control requirements and can be selected for new installations or existing automated metering systems.
How a DLMS Protocol Energy Meter Fits Existing Systems
A dlms protocol energy meter can exchange readings and operational data with compatible collection equipment through a standardised interface. This reduces dependence on one manufacturer at the data layer and makes it easier to connect new meters to systems that already use DLMS/COSEM. A dlms electric meter therefore becomes part of a broader metering architecture rather than an isolated device.
AIST A300 Series: Configurations and Communication Options
The AIST A300 range covers twelve listed configurations: a base version, a version without a relay, 5G, Wi-Fi/Ethernet, 3G+Ethernet, 4G+Ethernet, Ethernet, LoRaWAN, NB-IoT, PLC, RF and Wi-Fi. All configurations in this category use DLMS for metering data exchange; the communication option determines how that data reaches the collection system.
Wired options are appropriate where the facility already has local infrastructure. Ethernet is suitable for sites with a structured network, while PLC can use the power network as the communication medium. Cellular variants are relevant when meters are installed across dispersed locations. Local wireless options such as Wi-Fi and RF can be used where devices and collection equipment operate within the same facility.
For projects where DLMS functionality is not required, JCOM IoT also offers a separate range of three-phase electricity meters. This also separates DLMS-based equipment from other three phase electricity meters in the catalogue.
Cellular Models: 4G, 5G and NB-IoT
Cellular communication allows meters to send data from locations where wired access is unavailable or costly to deploy. Depending on the project, this may simplify connection of remote commercial facilities, utility assets or industrial sites. An iot based 3 phase industrial meter can therefore be integrated without building a separate communication line to every metering point.
Ethernet, PLC and RF for On-Site Networks
Ethernet is suitable for facilities with an existing LAN. PLC can be useful where communication over the electrical network reduces additional cabling. RF provides a local wireless option when short-range communication between meters and collection equipment is more practical.
LoRaWAN Meters for Distributed Sites
LoRaWAN can be considered for distributed metering points where a low-power wide-area network is already part of the site architecture. The communication method should be selected according to coverage, topology, infrastructure ownership and the way meter data will be collected.
Three-Phase Meter Price: What Affects the Cost
A 3 phase meter price cannot be determined from the communication protocol alone. The final configuration depends on accuracy requirements, the selected communication interface, whether a disconnect relay is required, certification for the destination market, order volume and supply conditions.
The same factors influence the three phase meter cost in larger projects. Two meters from the same AIST A300 family may have different project pricing because the communication module, relay configuration and certification package are not identical. The category therefore uses “Price on request” rather than publishing one figure for every application.
Volume Pricing and Lead Times
For project orders, JCOM IoT prepares pricing according to quantity, selected AIST A300 configuration, destination market and required documentation. Submit the project parameters through the engineering request form to receive a calculation within one business day.
Integration with Metering and Dispatching Systems
A three-phase meter is one element of an automated metering architecture. Readings can be collected through data acquisition controllers, transferred to an upper-level system and made available for monitoring, reporting or integration with external software through the project’s data interfaces.
In an IoT-enabled deployment, remote reading allows operators to collect consumption data without routine manual visits. Depending on the system design, the same data chain can support imbalance monitoring and detection of events associated with meter tampering. The communication channel may vary between sites, while DLMS keeps the metering data model consistent.
Data Acquisition Controllers and Dispatching
Controllers provide the intermediate layer between field meters and supervisory software where local collection, aggregation or transmission is required. At the upper level, an نظام التحكم في الإرسال الآلي can receive and present data from distributed metering points.
Remote Reading and Tamper Detection
Remote access is useful for facilities with many meters, restricted technical areas or geographically separated sites. Scheduled collection can reduce manual reading work, while event and status data can help identify abnormal operating conditions or possible interference that requires inspection.
Certification and Supply
Three-phase metering projects often require more than the meter itself. Acceptance may depend on verification records, technical documentation and certification that is valid for the destination market. These requirements should be confirmed together with the selected AIST A300 configuration before shipment, especially for utility or regulated commercial use.
Documentation for Utility and Industrial Projects
Certification requirements can vary by region and by the organisation accepting the equipment. Preparing the documentation package before dispatch reduces the risk of receiving meters that cannot be approved for the intended project.
JCOM IoT ships DLMS-compliant three-phase meters from its Dubai warehouse (Dubai Digital Park, Dubai Silicon Oasis) across the Middle East, Central Asia, Africa and worldwide. Every shipment includes the full certification package required for utility acceptance in the destination market.
A DLMS-compliant energy meter uses the DLMS/COSEM standard to structure and exchange metering data with compatible collection and management systems. In a three-phase project, this allows readings, events and operational data to be transferred through a standardised interface while the communication channel – such as Ethernet, cellular, PLC, RF or LoRaWAN – can be selected separately for the site.
Yes. DLMS meters can be integrated with existing metering infrastructure when the current data acquisition and upper-level systems support the required DLMS/COSEM profiles and interfaces. The exact integration scheme depends on the installed controllers, communication network and software. This makes protocol compatibility and interface verification important before equipment is selected for a retrofit or expansion project.
The cost depends on the selected AIST A300 configuration, communication interface, accuracy requirements, relay option, certification package, order volume and destination market. JCOM IoT therefore lists these meters as “Price on request” rather than publishing one universal figure. Project pricing is calculated after the required configuration, quantity and supply conditions are defined.
The AIST A300 series is available in twelve listed configurations, including 5G, Wi-Fi/Ethernet, 3G+Ethernet, 4G+Ethernet, Ethernet, LoRaWAN, NB-IoT, PLC, RF and Wi-Fi, plus the base model and a version without a relay. All configurations in this category use DLMS for metering data exchange, while the communication channel is selected for the project architecture.
JCOM IoT supplies DLMS-compliant three-phase meters, communication modules and data acquisition controllers for utility and industrial metering projects — contact the engineering team with your project scope, target region and quantity for configuration and pricing.










